High-Crash Roads
US-550 South Corridor (MP 117.3 to 126.1)
CDOT documented this stretch of US-550 south of Montrose as a high-crash corridor, with primary causes including wildlife-vehicle collisions, rear-end collisions, and broadside collisions at skewed intersections. Wildlife accounted for 50 percent of crashes in the segment between MP 109 and 119 over a 10-year study period. CDOT completed a $40 million safety project in 2024 that added 8-foot wildlife fencing, realigned intersections at Trout, Solar, and Racine Roads, and installed new passing and auxiliary lanes. Despite those improvements, the corridor remains a serious risk for motorcyclists.